Info

Products (Lbs)

Oct 2000 - Sep 2001 : Average Performance Indicator

Resulting average PI/production graph & equation

Resulting average PI/production graph & equation

Agreed target

Performance improvement for electricity = 3 %

We accept the data set from this period to be a base line for performance improvement verification. Approved by:_.

Box 5.11: Agreed Target & Baseline Dataset - Water Data Sample

Subject: Electricity

Baseline data period: From: October 2000 To: September 2001 Table with baseline data set:

Month Production (Lbs) Water

WATER

(m3/Lbs)

00-Oct

e93ese

17 757

0.02e

00-Nov

321 ee2

12 939

0.020

00-Dec

3es 551

12 2ee

0.022

01-Jan

993 7sG

13 3e3

0.017

01-Feb

1e3 s13

15 723

0.019

01-Mar

1e5 se9

15 se1

G.G1s

01-Apr

22G 4e4

12 997

0.02s

01-May

e3s 57e

10 493

G.G1s

01-Jun

045 se0

11 1s5

0.013

01-Jul

915 734

90e5

0.012

01-Aug

G23 7e4

ses7

0.011

01-Sep

542 ess

s5s4

0.012

Total

S 452 086

148 920

Resulting average energy/production graph & equation

Water Consumption = 0.0038 x Products + 9231

Water Consumption = 0.0038 x Products + 9231

200000 400000 800000

Products (Lbs)

200000 400000 800000

Products (Lbs)

Oct 2000 - Sep 2001: Average Performance Indicator PLâ„¢ = 0.017 m3/lbs

Resulting average PI/production graph & equation

0 200 000 400 000 e00 000

Products (Lbs)

0 200 000 400 000 e00 000

Products (Lbs)

Agreed target

Performance improvement for water = 20 %

We accept the data set from this period to be a base line for performance improvement verification. Approved by:____

WATER

1 GGG GGG

requires analytical thinking, as explained in Part I Chapter 3 and a deep understanding of the energy-production relationship. Therefore, ECC teams may need intensive external support during that period until they develop confidence that the system works well and that their 'reading' of performance data is correct.

Regular and prompt feedback from top management will be essential for developing staff confidence and motivation for a continuous search for performance improvement. A structured way of reporting should be introduced in order to facilitate communication between management and EEC teams. An example form in Box 5.12 ties together all the EEMS operational issues: